ECOSYNC / CASE STUDIES

Real buildings. Proven results.

Discover the measurable impact of ecosync across commercial and institutional buildings. Explore reported project outcomes and the evidence behind them.

PROJECT OUTCOMES

Results, building by building.

These are individual project results, not sector averages or guaranteed savings. Customer identities are withheld in this public-facing draft.

01 / Student accommodation
43.9%

Smarter heating across a residential estate.

Reported heating-energy savings from a multi-site PBSA deployment, using intelligent radiator control across existing wet-heating systems.

10 sites1,260 controllers
Reported project outcome · PBSA case study
02 / Healthcare
51%

Lower heating demand in clinical support spaces.

Reported savings across suitable non-critical healthcare areas following installation of room-level radiator control.

14 valve actuators≈30.7 MWh saved5.57 tCO₂e
Reported heating-season outcome · healthcare case study
03 / Education
42.6%

More responsive heating for learning environments.

Reported heating-energy reduction in an education installation, supported by room-level control and building performance monitoring.

56 controlled rooms / radiators22.28 MWh saved4.07 tCO₂e
Reported individual project outcome · education case study
04 / Commercial offices
36.8%

Estate visibility meets operational control.

Reported heating-energy savings from an office estate deployment, combining connected radiator control with performance oversight.

7 buildings935 valve actuators
Reported project outcome · office case study
05 / Hospitality
39%

Hospitality heating that responds to use.

Reported savings projection following a short monitoring period at a hotel installation. This is not a full-year verified outcome.

≈100 controllersOne-day installation
Annualised projection · based on short-period monitoring
HOW TO READ THE RESULTS

Evidence with context.

Performance varies with building fabric, heating demand, occupancy, baseline conditions, installation scope and monitoring period. We distinguish project results from sector averages and projections.

Measured and reported

Figures represent ecosync-reported project outcomes as described in the underlying case studies. Individual building performance is not a prediction for another site.

Sector averages

The Sectors page presents separate 2025–26 averages across ecosync installations. They should not be confused with the individual results shown here.

Projected outcomes

Where a figure is annualised from a shorter observation period, we label it as a projection rather than a verified annual saving.

YOUR BUILDINGS. YOUR BASELINE.

See what intelligent heating could deliver.

Every estate is different. Start with your building type, existing heating system and operating requirements to explore the opportunity.